The Energiewerkstatt delivered the know-how for half of the installed wind turbines in Austria (469 MW). The success quota for the implementation of projects is 97%. Tauernwindpark Oberzeiring, Windpark Sternwald, Windpark Steinberg-Prinzendorf and Windpark Höflein are showcase projects which illustrate the solution oriented work of the Energiewerkstatt´s professional team.
The Tauernwind Farm Oberzeiring was the highest wind farm in Europe at the time of installation (1,850 meters). The extreme weather conditions (ice, snow, strong winds) and the sensible alpine flora and fauna presented a great challenge to the planners. New transport methods were created which made it possible to overcome the long distances.
Right from the beginning, it has been a basic principal of the EWS Consulting to make sure that there is suitable distance from wind turbines to nearby dwellings. This means that, in a landscape scattered with houses, the only possible wind turbine sites are on exposed summits or in forests free of dwellings. Wind farm Sternwald was the first wind farm to be built in a forest.
Austrian wind experts estimate that the wind energy potential in Austria amounts to three times as much as the total installed capacity of all wind turbines in 2008 (approximately 1000 MW). The utilization of this potential could be possible with just doubling the number of wind turbines. The magic word is "repowering". - In Steinberg-Prinzendorf this method was used for the first time in Austria to replace an earlier generation of wind turbines with 2 MW state-of-the-art turbines.
Höflein ist the first large wind farm in Austria with the new clean energy tariff. In recent years, wind energy development had been limited to only single wind turbines! Wind Farm Höflein was approved in 2009 and has been under construction since fall 2010. The wind farm is located in one of the best wind regions in Austia, and will produce 33 million kWh annually.